Skip to main content
Skip header

Mine Surveying II

* Exchange students do not have to consider this information when selecting suitable courses for an exchange stay.

Course Unit Code544-0018/06
Number of ECTS Credits Allocated5 ECTS credits
Type of Course Unit *Compulsory
Level of Course Unit *Second Cycle
Year of Study *First Year
Semester when the Course Unit is deliveredWinter Semester
Mode of DeliveryFace-to-face
Language of InstructionCzech
Prerequisites and Co-Requisites There are no prerequisites or co-requisites for this course unit
Name of Lecturer(s)Personal IDName
MIK56doc. Ing. Milan Mikoláš, Ph.D.
MUC40Ing. Jitka Mučková, Ph.D.
CER51doc. Ing. Pavel Černota, Ph.D.
Summary
The subject describes tasks of mining surveying by assurance of reference
materials, their processing for map documentation by mining way extraction of
minerals.
Learning Outcomes of the Course Unit
The goal is to teach students basic principles of measurement stations mining and underground mining works in the bearings.
Course Contents
Curriculum:
1st attachment and orientation measurement of one trench:
2nd projection of the plumb, Wilského complex projection,
3rd attachment patterns and their accuracy,
4th overall accuracy of the connection
5th attachment and orientation measurement of magnetic,
6th attachment and orientation measurements gyrocompasses.
7th attachment and orientation Measurement with two JAMA - Accuracy connection
8th attachment and orientation measurement of a horizontal mine working - Accuracy
connection
9th setting out tasks in the mine:
a. that direction,
b. tracing a bow,
c. prorážkové programs
d. ranging arches.
10th mine surveying work in the pits:
A pit measuring verticality,
b. determining the Wednesday of the old pits.



Content of training:
1st observation swings plummet in the duct,
2nd Wednesday calculation of swing,
3rd Wilského complex screening weights for 4 - calculation,
4th Connection connection triangle - calculation - accuracy,
5th Connection Foxovým quadrangle - calculation - accuracy,
6th attachment and orientation Measurement with two shafts - focus vsunutého
Traverse,
7th calculation vsunutého Traverse,
8th analysis of accuracy and rectifier connection Measurement with two shafts - calculation,
9th prorážkového calculation program - setting prorážkových angles
10th delimitation of the arc in the mine.


Questions:
1st Trigonometric leveling in the mine and its accuracy.
2nd Steel band-depth measurements and systematic errors.
3rd The accuracy of the calculation of systematic errors of measurement depth and the overall accuracy
depth measurements.
4th Using e-mail. optical range finders for measuring depth - other ways the City.
measurements.
5th magnetic declination and its amendments.
6th Miner's compass compass measurement methods and programs.
7th Theory of the gyrocompass. Free gyroscope and its properties in the Earth's gravity field.
Gyroscope shuttle and its use in determining the astronomical direction. Types
gyroteodolitů.
8th Connection and orientation measurements in the mine, the purpose of measuring the accuracy
measurements.
9th Connection and orientation measurement of horizontal or úklonným mining work -
accuracy of the connection.
10th attachment and orientation measurement of one shaft and two plumb line - the principle
and measurement procedure.
11th The issue of screening under the plumb Wilského - Wilského complex projection.
12th issues screening plumb under Sandeno.
13th Calculation of the centers of swings for 4 weights.
14th Determination of the accuracy of projected lines.
15th Connecting triangle and its accuracy.
16th Fox's attachment pattern and its accuracy.
17th The overall accuracy of the rectifier and the connection of measurement one and two Yama
plumb.
18th attachment and orientation measurement of magnetic and gyroteodolitem.
19th Connection and orientation Measurement with two pit - the connection to the surface.
20th Connection and orientation Measurement with two pit - connection parenthetical
polygonal ranking in the bottom.
21st Overall accuracy and rectifier connection Measurement with two shafts.
22nd Prorážkové programs - prorážkových types of programs and tracking method.
23rd Accuracy prorážkových programs.
24th Staking arches below.
25th Wednesday Determining the old pits.
26th Measurement of verticality pits.
Recommended or Required Reading
Required Reading:
Kubečka, E. : Geodézie a důlní měřictví, VŠB – TU Ostrava 1992
Kubečka, E. : Vybrané kapitoly z důlního měřictví, VŠB – TU Ostrava 1996
Neset, K. : Důlní měřictví I, SNTL Praha 1966
Neset, K. : Důlní měřictví II, SNTL Praha 1967
Vyhláška ČBÚ č. 435/1992 ve znění vyhlášky č. 158/1997 o důlně měřické činnosti
a některých činnostech prováděných hornickým způsobem, Ostrava Montanex 1997.
Kubečka, E. Vybrané kapitoly z důlního měřictví, VŠB-TU Ostrava 2002,
http://igdm.vsb.cz
Kubečka, E. : Geodézie a důlní měřictví, VŠB – TU Ostrava 1992
Kubečka, E. : Vybrané kapitoly z důlního měřictví, VŠB – TU Ostrava 1996
Neset, K. : Důlní měřictví I, SNTL Praha 1966
Neset, K. : Důlní měřictví II, SNTL Praha 1967
Vyhláška ČBÚ č. 435/1992 ve znění vyhlášky č. 158/1997 o důlně měřické činnosti
a některých činnostech prováděných hornickým způsobem, Ostrava Montanex 1997.
Kubečka, E. Vybrané kapitoly z důlního měřictví, VŠB-TU Ostrava 2002,
http://igdm.vsb.cz
Recommended Reading:
------------------------------------------------------------------
------------------------------------------------------------------
Planned learning activities and teaching methods
Lectures, Individual consultations, Tutorials, Project work
Assesment methods and criteria
Task TitleTask TypeMaximum Number of Points
(Act. for Subtasks)
Minimum Number of Points for Task Passing
Exercises evaluation and ExaminationCredit and Examination100 (100)51
        Exercises evaluationCredit33 (33)17
                ProjectProject33 17
        ExaminationExamination67 (67)34
                Written examinationWritten examination33 17
                OralOral examination34 17