Reconstruction of dormitory

  • THERMAL INSULATION OF BUILDING "C"

Year of reconstruction:                         2018           

Part of the reconstruction was the insulation of the shell of the dormitory´s building C. At the same time, balcony´s doors were replaced.

  • THERMAL INSULATION OF BUILDING "D" INCLUDING WINDOWS EXCHANGE

Year of reconstruction:                         2017

Part of the reconstruction was the insulation of the shell of the dormitory´s building D. At the same time, windows were exchanged, including the replacement of external and internal sills and the provision of interior blinds.

  • RECONSTRUCTION OF BUILDING WINDOWS "E"

Year of reconstruction:                         2016

The subject of the work was the replacement of the remaining windows of the dormitory´s building E, including the replacement of external and internal sills and the delivery of interior blinds.

  • CONSTRUCTION WORKS OF BUILDING "A"

Year of reconstruction:                         2016

The subject of the project was the construction of an evacuation lift in the area of an existing lift in the A building, including the entrance and technical areas at the elevator shaft. The project also included construction works for protected escape routes.

  •  WINDOWS REPLACEMENT IN THE BUILDING "C"

Year of reconstruction:                        2015

 The subject of the work was the replacement of the windows of the dormitory building C including the exchange of inner and outer sills and interior shutters.

  • INSULATION OF THE DORMITORY BUILDING "B"

Co-funded by:                                    State Environmental Fund of the Czech Republic

Year of reconstruction:                         2015

 The aim of the project is the facade insulation of the 13 stores building B, including the exchange of window glass and the insulation of the roof of the building. Minor modifications of existing heating system and the installation of thermostatic valves on radiators and installing control valves on the heels of the individual footrests are also the part of the project. In connection with the insulation of the roof there will be the lightning conductor system reconstructed.

Operační program ŽPEU

PHOTOGALLERY

Building A and BBuilding BBuilding B

  • INSULATION OF THE DORMITORY BUILDING "A" INCLUDING THE ROOF INSULATIN

Year of reconstruction:                       2013

 The reconstruction was the insulation of the building envelope and roof construction including lightning conductor system. At the same time there was windows replacement performed.

PHOTOGALLERY

Building A and BThe main entrance to the building A and BThe main entrance to the building A and B

  • CONSTRUCTION WORKS OF THE DORMITORY BUILDING "B" INTO HOTEL VSB-TUO OSTRAVA

Co-financed by:                                  VSB-TUO (60% of eligible expenditures)

                                                          EU (40% of eligible expenditures)

Year of reconstruction:                         2010/2011

The aim of the project was the reconstruction and modernization of the dormitory building B consisting of restoring water and electricity, flooring, upgrading of sanitary facilities, equipment rooms with nex furniture and achieving 100% room networking with internet access. Realization also dealt with the safety conditions of accommodation, that is protected escape routes in staircase, construction of evacuation of evacuation lift and adaptations of the connecting corridor and entrance hall. Also the risks associated with the operation of the building with the outdated electrical wiring and water supply were removed.

Part of the refurbished rooms in the number of 83 beds is offered to commercial accommodation and is certified to the level hotel Garni***, which also brought the construction of the hotel restaurant.

The project implementation achieved the increasing the level of services provided to accommodated students and hotel guests, boht domestic and foreign. The first guests staying in the refurbished rooms appreciated much greater comfort and also students are more interested in living in these new rooms. By the share in succesful course of athletic championship the support for the development of cultural, social and port events in Ostrava and the Moravian - Silesian region is also clearly confirmed.

logo_banner

 PHOTOGALLERY

STUDENT´S ROOMS

triple roomtriple roomkitchen_B

double roombathroomkitchen_B

HOTEL´S ROOMS

Building B - hotel - apartmentBuilding B - hotel Building B - hotel

 Building B - hotel - apartmentBuilding B - hotelBuilding B - hotel - bathroom

  • RECONSTRUCTION OF THE WERTICAL PIPES IN THE BUILDING "A"

Co-financed by:                                     The City of Ostrava

Total expenditures of the project:             13 000 000 CZK

Year of reconstruction:                            2010/2011

Accommodation Services VSB-TUO gained a public financial support from the City of Ostrava in 2010 for the partial reconstruction of the building A in the cost of 13 000 000 CZK. This fund was used for the partial reconstruction of the vertical pipes including the sanitary facilities, air ventilation, wiring and also for the new amenities in rooms of the cells 8 and 9 on each floor, including the hotel part.

Logo OSTRAVA!!!

PHOTOGALLERY 

3 beds roomdouble roomkitchen