Skip to main content
Skip header
Terminated in academic year 2020/2021

Project II. - Semestral Project

Type of study Follow-up Master
Language of instruction English
Code 227-0108/02
Abbreviation P2
Course title Project II. - Semestral Project
Credits 2
Coordinating department Department of Transport Constructions
Course coordinator Ing. Leopold Hudeček, Ph.D.

Subject syllabus

• Introduction, Terms of Reference
• Longitudinal profile of communications at the intersection
• Drawing of the situation of the railway crossing, traffic sign design
• Design road construction, communications sample crosscut
• Sample cross-section of the railway crossing at
• The situation at the crossing, detail drawings
• Statement of quantities and assessment
• Technological progress of implementation
• Create a budget PC
• Creation of budget passage
• Timetable of implementation
• Credit

Literature

- Coenraad Esveld: Modern Raiway Track, 2001 Dior Zwarthoed-van Nieuwenhuizen
- Fred L. Mannering, Scott S. Washburn, Walter P. Kilareski: Principles of highway engineering and traffic analysis, Publisher: Wiley, 2009

Advised literature

- Stein, B.: Building technology, 2nd edition, Wiley, 1997
- EN 15273-1:2013 - Railway applications – Gauges – Part 1: General – Common rules for infrastructure and rolling stock
- EN 13848-6:2013 - Railway applications - Track — Track geometry quality —Part 6: Characterisation of track geometry quality