Project sanitary facilities:
1st Situation
• drawing connections, water supply, sewerage and gas (individual resources)
• location HUV, HUP, placing sewer inspection chambers
• drainage of paved surfaces
• scale 1: 200 or 1:250
2nd Water supply project
• technical project report of water supply and water connections
• Attachments - determination of water requirements, design and assessment of water supply, list of fixtures
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection and risers VV
• Floor plans (scale 1:50)
showing the horizontal distribution VV, connection attachments
• axometrie developed or cut R & D (scale 1:50)
(Including water connections)
3rd Internal drainage project
• The technical report of the project drainage systems
and sewers
Annex - set the calculation of rain runoff and sewage plants, design and assessment of internal drainage, fixtures list
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, waste and ventilation pipes VK
• Floor plans and foundations (scale 1:50)
showing a down pipe VK connection connections
• vertical sections of the sanitary sewer system (scale 1:50)
(Waste and connecting pipes)
• vertical sections of storm sewer (scale 1:50)
• longitudinal section of the main branch and side branches of a down sewage pipes and storm drains (scale 1:50)
4th Internal pipeline project
• Internal technical report of the project pipeline and gas connections
Annex - determining the design of gas, design and assessment of the internal pipeline, a listing of fixtures, fittings, according to the classification of flue
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, Riser VP
• Floor plans (scale 1:50) showing the horizontal distribution VP connection connections
• isometric VP (scale 1:50)
(Including gas connections)
Develop a seminar paper on an assigned topic.
After consultation with teachers to apply the specified topic in the essay given project house.
1st Situation
• drawing connections, water supply, sewerage and gas (individual resources)
• location HUV, HUP, placing sewer inspection chambers
• drainage of paved surfaces
• scale 1: 200 or 1:250
2nd Water supply project
• technical project report of water supply and water connections
• Attachments - determination of water requirements, design and assessment of water supply, list of fixtures
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection and risers VV
• Floor plans (scale 1:50)
showing the horizontal distribution VV, connection attachments
• axometrie developed or cut R & D (scale 1:50)
(Including water connections)
3rd Internal drainage project
• The technical report of the project drainage systems
and sewers
Annex - set the calculation of rain runoff and sewage plants, design and assessment of internal drainage, fixtures list
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, waste and ventilation pipes VK
• Floor plans and foundations (scale 1:50)
showing a down pipe VK connection connections
• vertical sections of the sanitary sewer system (scale 1:50)
(Waste and connecting pipes)
• vertical sections of storm sewer (scale 1:50)
• longitudinal section of the main branch and side branches of a down sewage pipes and storm drains (scale 1:50)
4th Internal pipeline project
• Internal technical report of the project pipeline and gas connections
Annex - determining the design of gas, design and assessment of the internal pipeline, a listing of fixtures, fittings, according to the classification of flue
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, Riser VP
• Floor plans (scale 1:50) showing the horizontal distribution VP connection connections
• isometric VP (scale 1:50)
(Including gas connections)
Develop a seminar paper on an assigned topic.
After consultation with teachers to apply the specified topic in the essay given project house.