Project Seminary of Building Services I and Building Services II

Type of study Bachelor
Language of instruction Czech
Code 229-0158/02
Abbreviation PC
Course title Project Seminary of Building Services I and Building Services II
Credits 7
Coordinating department Department of Building Environment and Building Services
Course coordinator Ing. Petra Tymová, Ph.D.

Subject syllabus

Project sanitary facilities:

1st Situation
• drawing connections, water supply, sewerage and gas (individual resources)
• location HUV, HUP, placing sewer inspection chambers
• drainage of paved surfaces
• scale 1: 200 or 1:250
2nd Water supply project
• technical project report of water supply and water connections
• Attachments - determination of water requirements, design and assessment of water supply, list of fixtures
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection and risers VV
• Floor plans (scale 1:50)
showing the horizontal distribution VV, connection attachments
• axometrie developed or cut R & D (scale 1:50)
(Including water connections)
3rd Internal drainage project
• The technical report of the project drainage systems
and sewers

Annex - set the calculation of rain runoff and sewage plants, design and assessment of internal drainage, fixtures list

• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, waste and ventilation pipes VK
• Floor plans and foundations (scale 1:50)
showing a down pipe VK connection connections
• vertical sections of the sanitary sewer system (scale 1:50)
(Waste and connecting pipes)
• vertical sections of storm sewer (scale 1:50)
• longitudinal section of the main branch and side branches of a down sewage pipes and storm drains (scale 1:50)
4th Internal pipeline project
• Internal technical report of the project pipeline and gas connections

Annex - determining the design of gas, design and assessment of the internal pipeline, a listing of fixtures, fittings, according to the classification of flue

• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, Riser VP
• Floor plans (scale 1:50) showing the horizontal distribution VP connection connections
• isometric VP (scale 1:50)
(Including gas connections)

Develop a seminar paper on an assigned topic.
After consultation with teachers to apply the specified topic in the essay given project house.

Literature

David V. Chadderton - Building Servicces Engineering, London , 2007
F. Hall, R. Greeno – Building Services Handbook, Oxford, 2011
David E. Watkins – Heating Services in Buildings, Oxford 2011
G.J. Blower – Plumbing Mechanical Services, Essex 2006

Advised literature

John Canivan: How to Build a Solar Hot Water System, Sunny Future Press, Wantagh, Ny 2004