1. Technical report;
2. Calculation of the staircase, diagram, section and floor plan of the stairwell;
3. Thermal technical evaluation of the building.
Drawing part:
1. Coordination situation 1: 200 or 1: 250
2. Fundamentals 1: 50
3. Floor plans of the individual floors, the ceiling above the typical floors and the roofs of 1: 50
4. Stairway cut 1: 50
5. Roof Ground (Roof View) 1: 50
6. Views 1: 100