1. Procedures for designing measurement and control chain (instrumentation, software selection, communication links selection, …).
2. Procedures for solving assigned projects, team work, ….
3. Creation of el. schematics and printed circuit boards for prototype boards.
4. Application of basic laws of electrical engineering in the design of measuring and control chains (DC and AC circuits).
5. Circuits for unification and signal processing by application (implementation of special counter circuits, timers, circuit elements, …).
6. Information transfer between control circuit elements of control systems. Communication interface for data transmission between measuring system and PC.
7. Basic propertis of SCADA/MMI systems (advantages, reasons of deployment…).
8. Control Web system - (development environment, basic building elements, openness of the system, time controlled applications and data controlled applications, animation possibilities, system modularity, access from the Internet, connection with OPC, DDE, ActiveX control subsystems Control Web, …).
9. Work on the project.
10. Work on the project.
11. Work on the project.
12. Work on the project.
13. Work on the project.
14. Time reserve.
2. Procedures for solving assigned projects, team work, ….
3. Creation of el. schematics and printed circuit boards for prototype boards.
4. Application of basic laws of electrical engineering in the design of measuring and control chains (DC and AC circuits).
5. Circuits for unification and signal processing by application (implementation of special counter circuits, timers, circuit elements, …).
6. Information transfer between control circuit elements of control systems. Communication interface for data transmission between measuring system and PC.
7. Basic propertis of SCADA/MMI systems (advantages, reasons of deployment…).
8. Control Web system - (development environment, basic building elements, openness of the system, time controlled applications and data controlled applications, animation possibilities, system modularity, access from the Internet, connection with OPC, DDE, ActiveX control subsystems Control Web, …).
9. Work on the project.
10. Work on the project.
11. Work on the project.
12. Work on the project.
13. Work on the project.
14. Time reserve.