1st Legislation related to the preparation of production in mines and quarries and planning.
2nd Methods of evaluation focal relationships in a given mining area.
3rd Overview of mining coal underground mines issue, lignite, lignite, ore, non-ore and uranium.
4th Conceptual solutions essential for opening the mine and building its surface.
5th Strategy odrubávání stocks.
6th Possible ways of solving transport (horizontal, vertical and inclined).
7th Principles for effective preparation of production in the deep mines.
8th Contents of pre-production on the mines.
9th Determination of production capacity, time funds, mining and transport technology.
10th Solution discharging space, capacity, routing flow clears.
11th Drainage projects, the deployment of auxiliary machinery, assessment of rocks and soils.
12th Technical-economic indicators characterizing the overall concept of the mine or quarry.
13th Plans for opening, preparation and extraction, mining and technical plans and technological procedures, technical procedures. Breakdown of the mine or quarry project, respectively. its parts with special attention to economy and the project construction and operation of the organization
2nd Methods of evaluation focal relationships in a given mining area.
3rd Overview of mining coal underground mines issue, lignite, lignite, ore, non-ore and uranium.
4th Conceptual solutions essential for opening the mine and building its surface.
5th Strategy odrubávání stocks.
6th Possible ways of solving transport (horizontal, vertical and inclined).
7th Principles for effective preparation of production in the deep mines.
8th Contents of pre-production on the mines.
9th Determination of production capacity, time funds, mining and transport technology.
10th Solution discharging space, capacity, routing flow clears.
11th Drainage projects, the deployment of auxiliary machinery, assessment of rocks and soils.
12th Technical-economic indicators characterizing the overall concept of the mine or quarry.
13th Plans for opening, preparation and extraction, mining and technical plans and technological procedures, technical procedures. Breakdown of the mine or quarry project, respectively. its parts with special attention to economy and the project construction and operation of the organization