Lectures:
1st Engineering Surveying Course, History
2nd Basic concepts of measurement and setting - out, precision planning
3rd Analysis of precision mechanical measurements and setting - out distances
4th Analysis of the accuracy of indirect methods of measuring distances
5th Analysis of the accuracy of angles
6th Methods for Identifying the position of a point
7th Setting out a line, perpendicular and parallel
8th Setting out of the surface normal
9th Setting out of the height using levelling
10th Trigonometric Heights delimitation
11th Height setting out tasks
12th Spatial distance
13th Basic concepts of problem structures ranging
14th Surveying in the preparation and design of buildings
15th Control networks
Exercise:
1st Error ellipse.
2nd Direct measurement distances_ accuracy analysis.
3rd Identifying the line, the intermediate point.
4th Identifying the amount of leveling.
5th Height staking tasks_ delimitation plane with a given slope.
6th Motion control networks.
7th The position and height setting out the building.
8th Setting out a circular arc.
1st Engineering Surveying Course, History
2nd Basic concepts of measurement and setting - out, precision planning
3rd Analysis of precision mechanical measurements and setting - out distances
4th Analysis of the accuracy of indirect methods of measuring distances
5th Analysis of the accuracy of angles
6th Methods for Identifying the position of a point
7th Setting out a line, perpendicular and parallel
8th Setting out of the surface normal
9th Setting out of the height using levelling
10th Trigonometric Heights delimitation
11th Height setting out tasks
12th Spatial distance
13th Basic concepts of problem structures ranging
14th Surveying in the preparation and design of buildings
15th Control networks
Exercise:
1st Error ellipse.
2nd Direct measurement distances_ accuracy analysis.
3rd Identifying the line, the intermediate point.
4th Identifying the amount of leveling.
5th Height staking tasks_ delimitation plane with a given slope.
6th Motion control networks.
7th The position and height setting out the building.
8th Setting out a circular arc.