Network analysis in the building software and the building constructions simulation. Principles for preparation and buildings control process plan. Types of implementing bonds between activities in the light of the building readiness. Procedures defined activity duration. Activity controlled by resources – sequence to product calculations and budget. Production sequence optimalization. Model of building updating. Actual building construction control. System MS Project – advantages and disadvantages at the formation sailing list. Ways of the planning and buildings control with system PRIMAVERA – SURE TREK. System CONTECT for formation of building-technological project and control and tasting plan in sequence to a budget and product calculations BUILD POWER and WINKROS. ASPE System for preparation and construction of traffic buildings.
Literature
Act No. 526/1990 Coll., on prices, as amended
Act no. 183/2006 Coll., the Zoning Planning Act and Building Code effective (law constrction), as amended
Decree No. 499/2006 Coll., on construction documentation
Advised literature
User's guide to the MS Project, Microsoft
User's guide to the Primavera – SureTrek