Lecture:
1. Stages of the technological designing process, their scope, the manufacturing process
2. Importance and roles of standardizations
3. Methods of time standards setting in industrial production
4. Methods of standardization of processes
5. Graphics system for designing
6. Graphical documentation development
7. Material flow analysis methods
8. Kapacity calculations
9. Intra-plant transport
10.Warehouse management
11.Fire prevention and protection principles in designing
12.Technical gases
13.Workplace lighting
14.Water management system
Seminars:
1. AutoCAD in the computer room network, working environment setting.
2. Definition of the program, development of a technical drawing – students' individual work.
3. Technological procedures, major parts, principles of development.
4. Identification of the technological operations, recording them in the form.
5. Dividing plan, flame-cutting plan, cutting plan, semi-finished product cost calculation
6. Drawing of the pictorial sequence of the technological operations, identification of segments and procedures.
7.-10. Determination of the standards of the operations, standards documents, recording the standards of labour consumption in the dedicated form.
11.-13. Warehouse capacity determination.
14. Assessment of the program developer.
1. Stages of the technological designing process, their scope, the manufacturing process
2. Importance and roles of standardizations
3. Methods of time standards setting in industrial production
4. Methods of standardization of processes
5. Graphics system for designing
6. Graphical documentation development
7. Material flow analysis methods
8. Kapacity calculations
9. Intra-plant transport
10.Warehouse management
11.Fire prevention and protection principles in designing
12.Technical gases
13.Workplace lighting
14.Water management system
Seminars:
1. AutoCAD in the computer room network, working environment setting.
2. Definition of the program, development of a technical drawing – students' individual work.
3. Technological procedures, major parts, principles of development.
4. Identification of the technological operations, recording them in the form.
5. Dividing plan, flame-cutting plan, cutting plan, semi-finished product cost calculation
6. Drawing of the pictorial sequence of the technological operations, identification of segments and procedures.
7.-10. Determination of the standards of the operations, standards documents, recording the standards of labour consumption in the dedicated form.
11.-13. Warehouse capacity determination.
14. Assessment of the program developer.