1. Recognoscation of terrain
2. Stabilization of measuring points
3. Calculation of precision analyzes
4. Building a micro-network
5. Determination of geometric parameters of cableway
6. Layout and stabilization of the building plan and its securing by building benches
7. Measurement of longitudinal profile and cross sections
8. Surveying and calculation of cubage of earthworks
9. Determination of refraction coefficient
10. Preparation of the basis for the project
11. Preparation of the geodetic part of the documentation of the actual construction
12. Excursion
13. Processing of measured data and computing
14. Elaboration of final report from field work
2. Stabilization of measuring points
3. Calculation of precision analyzes
4. Building a micro-network
5. Determination of geometric parameters of cableway
6. Layout and stabilization of the building plan and its securing by building benches
7. Measurement of longitudinal profile and cross sections
8. Surveying and calculation of cubage of earthworks
9. Determination of refraction coefficient
10. Preparation of the basis for the project
11. Preparation of the geodetic part of the documentation of the actual construction
12. Excursion
13. Processing of measured data and computing
14. Elaboration of final report from field work