Course Unit Code | 225-0215/01 |
---|
Number of ECTS Credits Allocated | 1 ECTS credits |
---|
Type of Course Unit * | Compulsory |
---|
Level of Course Unit * | First Cycle |
---|
Year of Study * | Third Year |
---|
Semester when the Course Unit is delivered | Winter Semester |
---|
Mode of Delivery | Face-to-face |
---|
Language of Instruction | Czech |
---|
Prerequisites and Co-Requisites | Course succeeds to compulsory courses of previous semester |
---|
Name of Lecturer(s) | Personal ID | Name |
---|
| JAS09 | Ing. Marek Jašek, Ph.D. |
Summary |
---|
Network analysis in the building software and the building constructions simulation. Principles for preparation and buildings control process plan. Types of implementing bonds between activities in the light of the building readiness. Procedures defined activity duration. Activity controlled by resources – sequence to product calculations and budget. Production sequence optimalization. Model of building updating. Actual building construction control. System MS Project – advantages and disadvantages at the formation sailing list. System CONTECT for formation of building-technological project and control and tasting plan in sequence to a budget and product calculations BUILDpower S and Kros 4. |
Learning Outcomes of the Course Unit |
---|
Collecting of basic knowledges and skills in this branches:
- Information systems in the civil engineering
- System MS Project
- System Contec
- System BUILDpower S
- System Kros 4
Comprehension of basic ideas, correlations and its aplication by analysis of the problems.
|
Course Contents |
---|
1. – 2. Information systems in the civil engineering
3. Classification of products
4. – 5. System BUILDpower S
6. – 7. System Kros 4
8. System CONTEC.
9. – 11. Time schedulling. Create a logical model of how the work will be performed. Estimate activity durations. Calculate timings for the activities. Present the results.
12. – 13. System MS Project
14. Credit, control of programs
|
Recommended or Required Reading |
---|
Required Reading: |
---|
Act No. 526/1990 Coll., on prices, as amended
Act no. 183/2006 Coll., the Zoning Planning Act and Building Code effective (law constrction), as amended
Decree No. 499/2006 Coll., on construction documentation
|
Začínáme pracovat. Brno : BUILDpower. 2005. 41 s.
Uživatelská příručka k systému BUILDpower. Brno : BUILDpower. 2009. 152 s.
ÚRS PRAHA a.s. Rozpočtování a oceňování stavebních prací. Praha : ÚRS PRAHA, a.s., 2009. 210 s. ISBN 978-80-7369-239-1
ÚRS PRAHA a.s. Rozpočtování a oceňování stavebních prací. Praha : ÚRS PRAHA, a.s., 2012. 162 s. ISBN 978-80-7369-442-5
Oceňování stavebních prací. Manuál KROS plus. Praha : ÚRS PRAHA, a.s., 2009. 552 s
Jarský, Č. Automatizovaná příprava a řízení realizace staveb. Kralupy n. Vlt. : CONTEC, 2000. 222 s. ISBN: 80-238-5384-8
|
Recommended Reading: |
---|
User's guide to the MS Project, Microsoft |
Uživatelský příručka systému MS Project, Microsoft
Uživatelská příručka systému Primavera – SureTrek
Kubálek, T., Kubálková, M. Řízení projektů v Microsoft Office Project : učebnice pro vysoké školy. Brno : Computer Press, a.s., 2007. 264 s. ISBN 978-80-251-1770-5
|
Planned learning activities and teaching methods |
---|
Tutorials |
Assesment methods and criteria |
---|
Task Title | Task Type | Maximum Number of Points (Act. for Subtasks) | Minimum Number of Points for Task Passing |
---|
Graded credit | Graded credit | 100 | 51 |